Description
Deaeration of pump head during start up 4
The pump is equipped with a grinder system that grinds destructible solids into small pieces to lead them through pipes with a relatively small diameter
Flange connection
Pipe connection is via PJE (Victaulic®) couplings
The motor is fitted with the Grundfos Tempcon sensor that
tp 40 60 4 a f a bqqe cw3 98119685 Deaeration of pump head duringSingle stage, close coupled, volute pump with in line suction and discharge ports of identical diameter. The pump is of the top pull out design, i. e. the power head (motor, pump head and impeller) can be removed for maintenance or service while the pump housing remains in the pipework. The pump is fitted with an unbalanced rubber bellows seal. The shaft seal is according to EN 12756. Pipework connection is via PN 6 10 DIN flanges (EN 1092 2 and ISO
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy
You may also like
US$ 28.00
US$ 35.00
US$ 40.00
US$ 35.00





